LOWER ASSEMBLY COSTS
DUE TO DRILLING TEMPLATES
For the assembly of the floor pull-out units, 6 or 10 floor anchors have to be fixed in the hall floor. The floor anchors are required for fastening the rails or stop devices. A drawing for the exact positioning of the drill holes is included. When using a drilling guide, there is no need for time-consuming measurement of the positions of the drill holes and the installation time can be significantly reduced. We recommend the use of drilling guides, especially when installing a large number of floor pull-out units. In the optimum situation, 3 drilling guides are used in a 2.700 mm panel. After the installation of the floor pull-out units, the guides can be sent back to us and we will credit the amount to you.